Technical Support available for assistance. % Caltrans requires the use of these new RSP gradations starting August 1st, 2016 in new projects and those not yet at 30 percent PS&E stage. XYo[unHCih,(~ t@K{ y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H /$Q-Aav. 0000000871 00000 n If necessary, order additional weep holes. Paver Border InstallationPavers are "wet set" into concrete to create a The plans will designate which type applies at each location. 0000002021 00000 n Erosion Control Blankets Wattles help slow water runoff and reduce soil erosion. Angular shaped rock may be used on any planned slope. L Earth Compacted Fabric Engineering 6'' 1'-0'' centers Staples at 6'' 2'' 6'' (Rock Splash Basin) TYPE 4 1 2 (Rock Slope Protection) TYPE 5 Staples at 12 inch centers. DOCX ppmoe.dot.ca.gov Hydraulic Design Manual: Embankment Protection - Texas Department of YOU MUST NOTIFY US FABRICS BEFORE RECEIVING PRICING. <> Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. All items. 0000013346 00000 n Click on a heading to sort by that heading. Erosion Control Fabrics featured here have been used in a wide range of applications including slope stabilization, sediment containment, runoff filtration, home protection, and vegetative regrowth. Details from the 2011 Maryland Standards and Specifications Weight will vary based on density of rock available for the project. 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). The State of Maryland pledges to provide constituents, businesses, customers, and stakeholders with friendly and courteous, timely and responsive, accurate and consistent, accessible and convenient, and truthful and transparent services. 0000005681 00000 n Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. Mirafi N-Series Product Description Sheet. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed in Section 4-7203A, Rock Slope Protection, of this manual. PDF BMP 17.00. Rock Slope Armor - Alaska Review the plans for the location and number of weep holes. Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. 0000002313 00000 n Mirafi 180N is a moderate weight nonwoven geotextile that meets AASHTO M288 Class 1 geotextiles for separation and subsurface drainage. Slope protection is usually needed to protect the upstream slope against erosion due to wave action. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. endstream engineering fabric pinned to the slope, or both a . Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. Running Mask Near MeSocial distancing standards are . Or fastest PDF California Bank and Shore Rock Slope Protection Design In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. This information is to be used only as a guide. with a minimum of 50% of the stones . 9 0 obj "QamV(Z3VL> 99 (30% off) Best Selling Saucony Flat Mask By mrhzid $8. Source: Caltran Highway Design Manual, Chapter 870 If you have any questions about the consistency of the gabions, you may also order the unit weight to be verified during the course of the work. We're available on the following channels. Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. Check to ensure that slopes and foundation areas are graded and compacted to specified tolerances. >> trailer << /Size 489 /Info 438 0 R /Root 464 0 R /Prev 989742 /ID[<23d8c9b814a334ef8bf252da6b923edc><23d8c9b814a334ef8bf252da6b923edc>] >> startxref 0 %%EOF 464 0 obj << /Pages 445 0 R /Type /Catalog >> endobj 487 0 obj << /S 1440 /Filter /FlateDecode /Length 488 0 R >> stream Copyright Maryland.gov. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. Placement of Bedding Material 1. C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) Ensure concrete is cured by one of the specified methods. uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Proven Product Track Record (Aggregate is widely accepted and approved)Wilson Quarry Products are recognized as the Industry Standard in the Monterey Bay Area, Product meets and is Certified for Army Corp Projects. <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN . Mirafi N-Series - TenCate Geosynthetics California - Geotextiles & DOT Specifications - US Fabrics Soil Stabilization Matting - Slope Application, Perm. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) Copies of these details are made available below in both Adobe Portable Document Format(PDF) and AUTOCAD Drawing (DWG) file formats. uuid:30dd8676-a64b-4579-9ccf-fc82965d356f Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. The bid item list and plans will specify which type of slope protection is to be performed. The contract will identify the designated method. (800) 518-2290, Providing the most comprehensive geosynthetic lines in the industry. 0000012468 00000 n The maximum height of the vertica l lower portions 3.5 feet. Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. Check the area to be protected to ensure that the required expansion joints are in place. 2. Riprap is a permanent layer of large, angular stone, cobbles, or boulders typically used to armor, stabilize, and protect the soil surface against erosion and scour in areas of concentrated flow or wave energy. /Type/ExtGState The samples will be crushed in the laboratory to sizes needed to perform tests. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. /Filter/FlateDecode The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. Close observation is required during rock placement to detect any damage to the fabric. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Class 2 is the default Class for M288 applications. Shop Lowe's for solutions to control erosion on slopes, as well. 0000007052 00000 n concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system >> If the rock contains an excess of fines or inadequate voids, the desired results may be impossible to obtain. US 160NW is a nonwoven needlepunched geotextile made of 100% polypropylene staple filaments. Vegetation (see . Manufacturers information can be found at: California Department Of Transportation: Item Code Search :t4NV]j{/mtqF*sx[%M 5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek Graniterock has a 101-year history of providing high quality products and service. The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. PDF Riprap Revetments - Ohio Department of Natural Resources Review contractors verification of unit weight of rock-filled gabions. 0000014254 00000 n 0000014231 00000 n - Shoreline Protection with EcoTubes&trade; CALTRANS does not have an APL/QPL for fabrics. Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. Slope Erosion Control | PRS Geo-Technologies Click on the to search for an item in <> Ensure the timber spacers are of the required material and spaced as planned. When slope paving with concrete pavers is specified, ensure the special provision requirements are met. Geotextiles. Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. 2 0 obj Draw Down Device, Sediment Basin Schematic - Vert. 2019-07-30T13:47:33-04:00 This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. 8 0 obj Otherwise, placement could result in what is known as rockers or unstable rocks. are available to meet BABA (Build America, Buy America) requirements. DM[2TI=lGQx7 UoFK1: V;39LFOr7LxPF{BL3he6X^@v[QhWiF!l3F) RTIBfx0.T F%n3h80Q,`[2xa%VLP /WD@j rK .9{N[#o/Fad#OK6YeqsyHl2M)V]/Nf(V?!1Oaw)fM 8JG)31m. Ensure that the contractor places the fabric before placing the rock slope protection. You may check the size of rock by roughly measuring the size and converting the volume to mass. To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. (see Riprap Slope Protection Worksheet). C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 JavaScript is required to use content on this page. For details about concrete production, review Section 4-90, Concrete, of this manual. For measurement and payment, do the following: Chapter 1 - Caltrans Construction Organization, CalOES: Power Outage and Fire Recovery Resources. CHAPTER 5 SURFACE AND SLOPE PROTECTIVE MEASURES - Food and Agriculture Also, ensure the contractor does not drop rock into place; otherwise, cracking or breaking may occur. Soil Stabilization Matting - Slope Application, Clear Water Pipe Through Silt Fence/Super Silt Fence, Temporary Stone Outlet Structure (1 of 2, PDF only), Temporary Stone Outlet Structure (2 of 2, PDF only), Temporary Gabion Outlet Structure (1 of 2, PDF only), Temporary Gabion Outlet Structure (2 of 2, PDF only), Standard Inlet Protection (1 of 2, PDF only), Standard Inlet Protection (2 of 2, PDF only), Combination Inlet Protection (1 of 2, PDF only), Combination Inlet Protection (2 of 2, PDF only), Pipe Outlet Sediment Trap ST-I (1 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (2 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (3 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (1 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (2 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (3 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (1 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (2 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (3 of 3, PDF only), Concentric Trash Rack and Anti-Vortex Device (1 of 2, PDF only), Concentric Trash Rack and Anti-Vortex Device (2 of 2, PDF only), Types of Couplers for Corrugated Steel Pipe, Sediment Basin Schematic - Horiz. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28 1}9AQ #T6Bc*)_vU"]T hY# Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. endobj When slope protection is paid by weight, refer to the discussion of weighing and metering procedures in Section 3-902E, Weighing Equipment and Procedures, of this manual. Rock Slope Protection / Rip Rap - Graniterock Nonwoven Geotextile Fabrics If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Be sure to consult your local project engineer or construction professional about the rock sizing and particular . The gabion method consists of placing wire mesh box-shaped baskets filled onsite with hard, durable rocks. 0000004014 00000 n Barrier Landscape Edging & Paver Edging 6'/8. e&C+uPaN.%y5*>EJ9gcD,i4E|+I,b0 f)#H+E m:(B(u1b)Q%>cayKh 0SYB@RenkJ1HJ b#'mYtQS1 HU" 2`VoVsB: ~',2g(5DZsHrxUR5~4 4_ {YNjTjdV \ (aazR#;@1""(*$4"!f)G(J Cold storms bringing wind, rain and low-elevation snow heavy at times are forecast through early March. endobj /OPM 1 Mirafi 1100N, 1120N and 1160N are heavy weight nonwoven geotextiles for more severe or extremely harsh conditions, such as rip-rap and revetment applications. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. Protection involves constructing a heavy mass of smaller rocks bound together by concrete. @>|0fWp^,Y/T!*gprE."8hjjJ7kUfmYxTsX"CfU2TL]Gdb_Kg,GA/`U)H!hkJARD[R` Place a layer (six inch minimum) of B. Cables. 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Costs and Installation Tips When Building a Riprap Barrier - The Spruce (One call ordering and delivery). PDF STANDARD FOR SLOPE PROTECTION STRUCTURES - Government of New Jersey Provide galvanized guide rail cables a minimum 19 mm in diameter, consisting . Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. Other Names Rock Slope Protection. (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. Chapter 4: Construction Details, Section 72: Slope Protection Click it again to reverse the order. 1 Maximum slope 1.5:1 horiz:vert, (67% or 34) or flatter, and is limited to slopes < 30' of uninterrupted length. 463 0 obj << /Linearized 1 /O 465 /H [ 928 1116 ] /L 999132 /E 15929 /N 109 /T 989753 >> endobj xref 463 26 0000000016 00000 n Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. 6'' min. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. {.sAewh[w#Iv#W6f" $JOPf/W%%XKK&A~b ?nfY_iu"m]HDwP) Rp (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. The contract plans will designate the required rock layer thickness for each location. US 160NW - US Fabrics The following common types of slope protection are covered in this section: Other protective devices are used in conjunction with highway construction, and when used, they are included in the contracts special provisions. Standard contract items and descriptions for Caltrans projects. California Department Of Transportation: Item Code Search At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. xZrFou D[&! 0000008331 00000 n %PDF-1.4 If your 20'x10' patio is to have a 6" base, then you should excavate a total area of 21' (20' +6" +6") by 11' (10' +6" +6"). Erosion prevention practices - Riprap - Minnesota Stormwater Manual <>stream The Maryland Department of the Environment (MDE)recentlyadopted the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. . Before placement of the broken concrete, inspect the material and be sure the reinforcement has been removed flush to the surface of concrete. Provide filter fabric in accordance with DMS-6200, Filter Fabric. For protection stone riprap, provide Type 2 filter fabric unless otherwise shown on the plans. A geotextile is typically defined as any permeable textile material used to increase soil stability, provide erosion control or aid in drainage. Stable rock sizes and flow depths for riprap-lined channels having gradients between 2 percent and 40 percent may PDF California Bank and Shore Rock Slope Protection Design PDF BMP-041 Rock Slope Protection 4-6-12 - Tahoe BMP The Standard Specifications provide two methods of placement for this type of protection: Method A and Method B. The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. Erosion Control at Lowes.com Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. Soil Stabilization Matting - Channel Application, Temp. For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . Shoreline Erosion Control Fabric Pro Fabric Supply These products can be used in areas where they meet the local agency requirements. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. Chapter 4: Construction Details, Section 72: Slope Protection, Direction of flow and angle of impingement at various water stages, Capability of adjacent soil types to resist erosion from wash and eddy currents. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Fabric used for rock slope protection, temporary construction roadways, separation, stabilization, reinforcement, drainage, and erosion control. Benchmark inspection of sampling and testing of rocks. Geotextiles - Feature Comparison - Hanes Geo - Leggett & Platt